Friday 1/10- 2 hours

-Chose groups.

-Assigned advisor for each group.

-Looked over the syllabus.

-Went over expectations for the website, report, and presentation

Tasks to do before next meeting:

-Start website layout

-Come up with and research 3-4 project ideas

Thursday 1/16- 45 minutes

-Discussed 3 ideas:IR wireless charging system, smart drug lockbox, trackable pet collar.

-Checked over the website layout

-Smart drug lockbox seemed the most feasible idea

Tasks to do before next meeting:

-Links to be added to the website for progress log, weekly minutes, block diagram

-Come up with more ideas

-Block diagram to be made for the lockbox with details on each block

Wednesday 1/22- 30 minutes

-Checked over website. Information needs to be added to weekly minutes and progress logs tabs. More traditional time and effort table to be integrated. 

-Talked about procedures of storing drugs in establishments

-Went over the block diagram that was made. Discussed lockbox idea in more detail.

-Lockbox idea conditionally approved pending discussion with industry professional by Dr Ejaz about need for the design

Tasks to do before next meeting:

-Come up with a more detailed block diagram

-Update weekly minutes and progress logs links

-Replace existing time and effort table with a more traditional table and update on website

-Continue researching the project idea

Wednesday 1/29- 20 minutes

-Checked over website. Updated time and effort table and weekly minutes tab are acceptable.

-Flow diagram for each transaction looks good

​

Tasks to do before next meeting:

-Condense time and effort table to weekly instead of daily.

-Work on abstract on the front page of the site

-Progress log needs to be more visual, less summarizing

-Start working on Chapter 1 of proposal report

Wednesday 2/5- 15 minutes

-Checked over website. Abstract is acceptable, just need to leave out future implementations

-Block diagram looks good. Lock box block needs to be extended to encompass all parts

-Engineering specifications table needs to match sample in syllabus

-Progress log is now up to expectations

​

Tasks to do before next meeting:

-Edit Abstract section and block diagram

-Redo engineering specifications table

-Start working on budget, timeline, and Chapter 1 of the report

​

Wednesday 2/12- 15 minutes

-Checked over website.

-Abstract is now correct

-Block diagram is now correct

-Engineering specifications table now matches given template

-Budget and timeline look good

​

Tasks to do before next meeting:

-Edit budget to include prices of parts already owned and have total budget at the bottom

-Start working on Chapter 1 of the report

​

Wednesday 2/19- 10 minutes

-Checked over website.

-Fingerprint sensor in the block diagram needs to be on its own and not in series with the server

-Looked over report

-Report needs to follow guidelines in the syllabus, not just the template

​

Tasks to do before next meeting:

-Keep working on the report 

Wednesday 2/26- 10 minutes

-Looked over report

-Hyperlinks to be added to the report.

-Less details in chapter summaries

-Table labeled as a Figure

-Subheading spacing needs to be consistent

-Pictures and more details of components need to be added to Chapter 2

-More work is needed on Chapter 1

-Put page break on chapters

​

Tasks to do before next meeting:

-Keep working on the report 

Wednesday 3/4- 10 minutes

-Looked over report

-Figure and Table lists need to updated

-Chemical composition and problem sections need to be taken out of Chapter 1

​

Tasks to do before next meeting:

-Keep working on the report 

-Start ordering parts